Phase II. Measure
Purpose: This step is to measure the present level of selected CTQ to set up Base line, and is to select the improvement target and object of CTQ.
Activity STEP: Step 4. Set up the plan of data collection -> Sampling plus factor, Setup of measuring plan, Inspection of measuring system Step 5. Grasp of existing level -> Collection of Data, Grasp of existing level, Improvement object
Output: Step 4. List of plus factor : Cause and Effect Diagram, or Logic Tree, Plan of measurement, Gage R&R Step 5. Analysis result of process capability, Control chart : X_Bar R Chart or I Chart
Step 4 – Selection of plus factor Purpose: This step is to select plus factors for efficient measurement of CTQ, to set up the plan of it, and to inspect the reliability of system to be measured.
| Process |
Purpose |
Activity |
Tool |
Select plus factor |
• To select plus factor for efficient measurement of CTQ |
- To select plus factor - To review the factor-relation of Y and X’s - To define standard measurement |
- Cause and effect diagram - Logic Tree - X-Y Matrix |
Set up measuring plan |
• To set up hypothesis on measuring target, and its measuring plan |
- To set up measuring plan |
|
Inspect measuring system |
• To inspect reliability of system to be measured |
- Gage R&R |
- Gage R&R |
Step 5 – Measure Present Level Purpose: This step is to output process capability index, to structure existing Base Line, and to set up improvement object of CTQ.
| Process |
Purpose |
Activity |
Tool |
Collect data |
• To collect data based on measurement plan |
- To collect data |
- Sampling |
Measure the present level |
• To structure existing Base Line outputting Z of Y |
- Measure Z Level |
- Process capability - σ level - DPMO,DPU |
Improvement object |
• To set up improvement target and object of Y |
- To set up improvement object |
|
Structure existing Base Line outputting process capability index of Y
|